🎉 Up to 70% Off Selected ItemsShop Sale
HomeStore

Downloadable Woodworking Project Plan to Build

Product image 1

Downloadable Woodworking Project Plan to Build

Increase the capacity of your tablesaw and router by combining them in one accommodating twin-cabinet design. The advantages include:

  • A larger tabletop.
  • Ample onboard accessory storage.
  • Dedicated dust containment.
  • This compact, wheeled work center provides all kinds of room for router bits, saw blades, miter gauges, wrenches, and other accessories.
  • Includes the Easy-Mover Mobile Base.
  • This plan was built and proven in the WOOD magazine shop by its editors and master craftsmen.

This is a downloadable plan. Instructions given to download after checkout.

Finished Size: 70-5/8in. L x 25-1/2in. W x 35in. H (Height may vary based on casters used.)


MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY

$4.48

Original: $14.95

-70%
Downloadable Woodworking Project Plan to Build—

$14.95

$4.48

Product Information

Shipping & Returns

Description

Increase the capacity of your tablesaw and router by combining them in one accommodating twin-cabinet design. The advantages include:

  • A larger tabletop.
  • Ample onboard accessory storage.
  • Dedicated dust containment.
  • This compact, wheeled work center provides all kinds of room for router bits, saw blades, miter gauges, wrenches, and other accessories.
  • Includes the Easy-Mover Mobile Base.
  • This plan was built and proven in the WOOD magazine shop by its editors and master craftsmen.

This is a downloadable plan. Instructions given to download after checkout.

Finished Size: 70-5/8in. L x 25-1/2in. W x 35in. H (Height may vary based on casters used.)


MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY